It looks like the Covid 19 virus lockdown is finally starting to slow down and various states are starting the slow process of reopening. Thank goodness for that. In the mean time my trike build is progessing rapidly.
Here is a short list of the recent work:
2.58:1, B gear box mounted on the engine
New hand throttle installed and foot throttle rebuilt
New throttle mixer installed
New foot brake fabricated and installed
Instruments mounted and wired in
Electrical connections and engine probes installed
New fuel primer installed and fuel lines finalized
There are just a few final details that should be wrapped up in the next week or so and then it will be on to testing!